0_public:logistics_and_infrastructure:refineries:whiting
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |||
0_public:logistics_and_infrastructure:refineries:whiting [2025/02/07 19:22] – removed - external edit (Unknown date) 127.0.0.1 | 0_public:logistics_and_infrastructure:refineries:whiting [2025/02/07 19:22] (current) – ↷ Page moved from refineries:whiting to 0_public:logistics_and_infrastructure:refineries:whiting pointnm | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | ====== Whiting Refinery ====== | ||
+ | |||
+ | BP’s Whiting refinery has ramped up operations to nearly maximum rates following an outage after a power loss in February. It is believed that the refinery is operating near its nameplate capacity of around 435k b/d. <wrap hi> | ||
+ | |||