0_public:pipelines:power_of_siberia
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
0_public:pipelines:power_of_siberia [2024/09/13 18:58] – removed - external edit (Unknown date) 127.0.0.1 | 0_public:pipelines:power_of_siberia [2024/09/13 19:00] (current) – pointnm | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | {{tag> | ||
+ | ====== Power of Siberia ====== | ||
+ | |||
+ | a pipeline that <wrap hi>links eastern gasfields</ | ||
+ | |||
+ | ===== Power of Siberia 2 ===== | ||
+ | |||
+ | a proposed line from Russia' | ||
+ | |||
+ | The project would also entail other risks. To recoup its investment, Gazprom would have to run the pipe at full tilt for at least 20 years.((The Economist May 4th 2024)) |